Follow ESVAGT A/S

Tags

Vessels

Offshore Wind 75 Craftsmanship and Dedication 67 Safety 64 Quality 61 SOV 60 Innovation 54 ERRV 43 Offshore Oil & Gas 35 HSE 33 Training 31 Health 31 Safe Transfer Boat 31 Customer Focus & Flexibility 30 Standby 30 ESVAGT 28 ESVAGT Standard 28 Constant Constructive Dissatisfaction 25 Environment 24 Fast Rescue Boat 22 Onshore base 22 Education 22 Walk to Work 20 My ESVAGT 14 Rescue 13 Esvagt Faraday 12 Esvagt Aurora 12 Transfer 12 Rescues 11 Esvagt Froude 11 Esvagt Connector 10 ESVAGT NJORD 10 CSR 8 Recruitment 8 Board 7 Esvagt Omega 7 Transfers 6 Esvagt Mercator 6 Fit for Fight 6 ESVAGT UK 6 Crew Change Vessel 6 Esvagt Dana 5 Esvagt Protector 5 Constant Improvement and Innovation 5 Esvagt Don 5 Ownership 4 Esvagt Charlie 4 Esvagt Gamma 4 MPV 4 Drill 4 Esvagt Supporter 4 Rig move 3 Risk Management Tool 3 AHTS 3 Crew Change 3 STB 3 Esvagt Echo 3 Esvagt Preserver 3 Esvagt Celina 3 Esvagt Stavanger 3 Esvagt Caroline 3 W2W 3 Vessels 3 Esvagt Innovator 3 Service Operation Vessel 3 Esvagt Beta 2 Esvagt Cantana 2 Esvagt Dee 2 Esvagt Preventer 2 Fire-Fighting 2 Esvagt Castor 2 Esvagt Cornelia 2 Esvagt Server 2 West Gamma 2 Offshore Vind 2 MRV 2 ESVAGT BRAVO 2 Fit for Duty 2 Esvagt Cassiopeia 2 Esvagt Observer 2 Esvagt Celeste 2 Esvagt Capella 2 Esvagt Champion 2 Esvagt Cobra 2 Esvagt Corona 1 Esvagt Kappa 1 oil spill 1 Esvagt Carina 1 Esvagt Carpathia 1 Esvagt Contender 1 esvagt schelde 1 Risk Management 1 Digitalisation 1 Esvagt Bergen 1 Craftmanship and Dedication 1 ESVAGT ALBERT BETZ 1 Senior Club 1 Business Development 1 Esvagt Promotor 1 Esvagt Christina 1 Esvagt Alpha 1 Esvagt Sigma 1 Show all tags
‘Esvagt Njord’ secures contract extension with Equinor

‘Esvagt Njord’ secures contract extension with Equinor

Press releases   •   Mar 03, 2021 08:10 CET

RENEWED CHARTER: Equinor and ESVAGT have extended their good cooperation with a 5-year contract extension for the vessel ‘Esvagt Njord’ at Dudgeon Offshore Wind Farm. The extension runs until 2026.

30 years without work-related incidents – ESVAGT vessel reaches notable milestone

30 years without work-related incidents – ESVAGT vessel reaches notable milestone

Press releases   •   Feb 21, 2021 08:16 CET

On Sunday, February 21st, the ‘Esvagt Preserver’ has completed 30 years of operation without a single severe work-related incident. Approach and company culture are crucial.

ESVAGT’s new SOV for Vestas is ready

ESVAGT’s new SOV for Vestas is ready

Press releases   •   Jan 11, 2021 10:03 CET

Ready vessel: Despite both a lengthy corona shutdown and financial problems for the shipyard, ESVAGT’s SOV newbuilding 'Esvagt Schelde' is now ready to start working for Vestas at Borssele 3-4 and Northwester 2 wind farms.

Digital worksuit system improves safety and overview

Digital worksuit system improves safety and overview

Press releases   •   Jul 18, 2019 08:15 CEST

ESVAGT’s new digital suit management prevents errors in suit and life jacket handling.

ESVAGT on its “Tour de North Sea”: ‘Practicing strengthens our emergency preparedness and maintains our competences’

ESVAGT on its “Tour de North Sea”: ‘Practicing strengthens our emergency preparedness and maintains our competences’

Press releases   •   Mar 27, 2019 08:30 CET

Daily training in the entire fleet keeps ESVAGT sharp, and the shipping company’s own assessor team is visiting the North Sea in ESVAGT’s “Tour de North Sea” to strengthen and deepen competence levels.

ESVAGT navigators train in DP operations

ESVAGT navigators train in DP operations

Press releases   •   Nov 27, 2018 08:30 CET

Dynamic Positioning (DP) workshop for navigators on ESVAGT’s Service Operation Vessels (SOV) strengthens risk assessments and trains optimal reactions.

New service eliminates weather risk in offshore WTG blade inspections

New service eliminates weather risk in offshore WTG blade inspections

Press releases   •   Sep 24, 2018 08:00 CEST

ESVAGT have joined forces with Wind Power Lab, an Artificial Intelligence and blade specialist, to offer a series of services that support the control of offshore assets and expand their lifetime, without any weather risk for the owners. The first service in the portfolio is the inspection of WTG blades.

ESVAGT divides its HSEQ function in two

ESVAGT divides its HSEQ function in two

Press releases   •   May 03, 2018 12:05 CEST

The new organisation in ESVAGT will strengthen both its focus on HSE and its continual optimisation of internal processes within service delivery.

Fitting out of the STB7 will be done by ESVAGT

Fitting out of the STB7 will be done by ESVAGT

Press releases   •   Dec 07, 2017 09:23 CET

One of the big game changers in ESVAGT’s Service Operation Vessel (SOV) concept for offshore wind farms has been ESVAGT’s unique Safe Transfer Boats (STB), which are used for transferring turbine technicians safely from the mother ship to the turbines.

Sertica ensures uptime and quality

Sertica ensures uptime and quality

Press releases   •   Oct 09, 2017 09:35 CEST

Every ESVAGT vessel now has the Sertica system implemented for purchasing and maintenance. It ensures quality, reduces the risk of breakdowns and can eliminate error related costs.

Praise to the 'Esvagt Server' during rig move

Praise to the 'Esvagt Server' during rig move

Press releases   •   Oct 04, 2017 10:27 CEST

Colleagues onboard the ’Esvagt Server’ can hold their heads high after completing a rig move of the ’Crossway Eagle’, a jack-up accommodation platform for Maersk Oil in the Danish sector.

Safety and quality strengthened by developing boat handling competences

Safety and quality strengthened by developing boat handling competences

Press releases   •   Apr 25, 2017 09:00 CEST

“Whether the job is rescuing people in high seas or sailing wind technicians safely around an offshore wind farm, the skills of those on board the vessels are critical for ESVAGT's success. That is why we are mapping and developing the competences on board our vessels”, says Steffen Rudbech Nielsen, Head of Ship Management, Operations.

“We deliver safety!”

“We deliver safety!”

Press releases   •   Mar 24, 2017 08:24 CET

ESVAGT's new Head of HSEQ Charlotte Feldvoss sees a strong safety culture as essential for ESVAGT's results.

Good quality delivery of the 'Esvagt Njord' from the shipyard

Good quality delivery of the 'Esvagt Njord' from the shipyard

Press releases   •   Aug 29, 2016 13:35 CEST

The ’Esvagt Njord’ was completed ahead of schedule and to a high level of quality. Experience from the first SOV years have been incorporated into the design.

"We are writing the manual for SOV work"

"We are writing the manual for SOV work"

Press releases   •   Aug 15, 2016 10:40 CEST

The first year of SOV operations has been rewarding and informative. Experience with STBs is being integrated into upcoming designs.

The new SOV for Statoil floated out in Poland.

The new SOV for Statoil floated out in Poland.

Press releases   •   Jun 16, 2016 11:19 CEST

The SOV for servicing Statoil in Dudgeon Wind Farm in the English sector is well underway.

Competence assurance at all levels

Competence assurance at all levels

Press releases   •   May 20, 2016 10:10 CEST

Over 200 ESVAGT colleagues are currently in career advancing training in the shipping company.

Mind-set, learning and knowledge sharing in focus in the HSEQ programme 2016

Mind-set, learning and knowledge sharing in focus in the HSEQ programme 2016

Press releases   •   May 17, 2016 11:50 CEST

ESVAGT wants to become better at analysing incidents and implements learnings from them.

FPAL Verified Assessment 2016

FPAL Verified Assessment 2016

Press releases   •   Apr 14, 2016 10:07 CEST

​ESVAGT was assessed by FPAL on 10 and 11 March 2016.

ESVAGT 2015 Full Year Results

ESVAGT 2015 Full Year Results

Press releases   •   Mar 15, 2016 10:15 CET

Revenue for the ESVAGT Group in 2015 was DKK 1,002.8m against DKK 946.5m in 2014. EBITDA for the year is DKK 435m compared to DKK 417m in 2014.